Southeast Florida · Treasure Coast → The Keys

01 / Service · Southeast Florida

TWS Exceeds ICRA Class I–IV

ICRA Barriers & Panels in Southeast Florida

Temporary Wall Systems are great for hospitals and other spaces that have to keep running while work happens around them. Anti-microbial panels, gasketed seals, and managed wall penetrations — negative-pressure ready and HEPA compatible, built to whichever ICRA class your risk assessment calls for. We put them up while the space stays open.

  • Compliance
    ICRA Class I–IV
  • Construction
    Sealed & Gasketed
  • Coverage
    Treasure Coast → The Keys

Request a quote

Get a clear proposal.

(561) 777-4958
NFPA & IBC Class A Fire Rating — Exceeds ASTM E84
Trusted by the teams building
Brasfield & Gorrie
Whiting-Turner
HCA Florida
Memorial
Lifetime Fitness
Tim Hortons
United Rentals
Gilbane
LEGO
WBC
Skechers
Baptist Health
Fulcrum Construction
Brasfield & Gorrie
Whiting-Turner
HCA Florida
Memorial
Lifetime Fitness
Tim Hortons
United Rentals
Gilbane
LEGO
WBC
Skechers
Baptist Health
Fulcrum Construction
TWS ICRA Barriers & Panels — modular containment wall installed in an occupied hospital corridor

What's included

ICRA Barriers & Panels

Every job covers the full run: we build the barrier to your infection-control plan, work inside the access windows your facilities team sets, move the wall as the project shifts between phases, and take it all out at closeout.

  • Class I–IV barrier construction
  • Negative-pressure ready
  • HEPA & airlock compatible
  • Managed wall penetrations
  • Flexible installation scheduling
  • Phased reconfiguration

Use cases for ICRA barriers

FAQ

Common ICRA Barriers & Panels questions

Have questions? Call or text (561) 777-4958.

What's the difference between an ICRA barrier and an ICRA panel?

Nothing — it's the same modular, gasketed wall system. Contractors and infection-control teams just tend to use both words for it.

What ICRA classes can you build to?

Class I through IV. Your infection-control risk assessment sets the class, and we build to it — negative-pressure ready and HEPA compatible at any level.

What does ICRA stand for?

Infection Control Risk Assessment. It's how a facility classifies the risk of a construction project, and that classification determines how the containment around it has to be built.

Do you rent the walls, or is installation included?

Installation and removal are always part of it. We set the walls up and take them back down ourselves — we don't drop off materials for someone else to handle.

What areas do you cover?

37 cities, from the Treasure Coast down to the Keys — the full list is below.

03 / Start the project

Tell us about your project.

A short conversation gets you a clear proposal — scope, timeline, and pricing.

Direct line(561) 777-4958
Office2240 W Woolbright Rd, Suite #416 · Boynton Beach, FL
Service areaTreasure Coast → The Keys · ICRA Barriers & Panels

Talk to our team

Get a clear proposal.