School Construction Containment
Sealed containment for school and university projects, built to keep classrooms usable during class hours.
- ComplianceICRA Class I–IV
- ConstructionSealed & Gasketed
- CoverageTreasure Coast → The Keys

























What's included
School projects live or die by the calendar. The summer window is short and immovable, and anything that slides past it means working around students — which turns indoor air quality, noise, and secure separation between construction and children into daily requirements rather than planning assumptions. This work is built with our ICRA barriers, the same system we install across Southeast Florida. Anti-microbial panels, gasketed seals, and managed wall penetrations go into every barrier we build, whatever the job spec happens to call it.
- Class I–IV barrier construction
- Negative-pressure ready
- HEPA & airlock compatible
- Managed wall penetrations
- Flexible installation scheduling
- Phased reconfiguration
02 / Industries we serve
Making construction zones blend in.
03 / What this environment demands
Why school construction containment is its own problem.
The calendar doesn't move
Summer is the window. Work that overruns it continues in an occupied building.
Occupied campuses need real separation
Students and construction can't share space. The barrier is a security boundary as much as a dust one.
Air quality is scrutinized
Indoor air quality in schools draws attention from parents and administrators alike.
Can work continue after students return?
Yes — sealed containment is what makes an occupied campus workable when the schedule runs past summer.
Can the wall be relocated between phases?
Yes. Panels come down and go back up in the next area, which suits projects that move room to room across a building.
Do you handle School Construction Containment?
Yes — anywhere from the Treasure Coast down to the Keys. It's built with our ICRA barriers.
What's the difference between an ICRA barrier and an ICRA panel?
Nothing — it's the same modular, gasketed wall system. Contractors and infection-control teams just tend to use both words for it.
What ICRA classes can you build to?
Class I through IV. Your infection-control risk assessment sets the class, and we build to it — negative-pressure ready and HEPA compatible at any level.