Southeast Florida · Treasure Coast → The Keys

01 / Use Case · Southeast Florida

TWS Exceeds ICRA Class I–IV

Pharmacy Remodel Containment

Temporary walls for pharmacy remodels, sealed to keep dust out while the pharmacy keeps dispensing.

  • Compliance
    ICRA Class I–IV
  • Construction
    Sealed & Gasketed
  • Coverage
    Treasure Coast → The Keys

Request a quote

Get a clear proposal.

(561) 777-4958
NFPA & IBC Class A Fire Rating — Exceeds ASTM E84
Trusted by the teams building
Brasfield & Gorrie
Whiting-Turner
HCA Florida
Memorial
Lifetime Fitness
Tim Hortons
United Rentals
Gilbane
LEGO
WBC
Skechers
Baptist Health
Fulcrum Construction
Brasfield & Gorrie
Whiting-Turner
HCA Florida
Memorial
Lifetime Fitness
Tim Hortons
United Rentals
Gilbane
LEGO
WBC
Skechers
Baptist Health
Fulcrum Construction
TWS modular containment wall for Pharmacy Remodel Containment — installed in an occupied hospital corridor

What's included

Pharmacy remodels frequently touch compounding areas, where the room's cleanliness classification and air scheme are regulated conditions rather than preferences. Add controlled-substance security and a dispensing operation that the rest of the facility depends on, and the containment has more to satisfy than dust control alone. This work is built with our ICRA barriers, the same system we install across Southeast Florida. Anti-microbial panels, gasketed seals, and managed wall penetrations go into every barrier we build, whatever the job spec happens to call it.

  • Class I–IV barrier construction
  • Negative-pressure ready
  • HEPA & airlock compatible
  • Managed wall penetrations
  • Flexible installation scheduling
  • Phased reconfiguration

03 / What this environment demands

Why pharmacy remodel containment is its own problem.

  1. Compounding areas are classified space

    USP-governed compounding rooms have defined air and cleanliness requirements that the work has to account for.

  2. Dispensing can't stop

    The floors above depend on the pharmacy. Work gets phased so the operation keeps running.

  3. Security is part of the layout

    Controlled-substance storage constrains where a barrier can be placed and who moves through it.

We work in every kind of healthcare facility — if your setting isn't listed here, it's still one we cover. These pages exist because people search by department, not because the list is a limit.

FAQ

Common Pharmacy Remodel Containment questions

Have questions? Call or text (561) 777-4958.

Can you contain part of a pharmacy while dispensing continues?

Yes — sealed panels let one area come out of service while the rest keeps operating.

What about compounding rooms?

Those carry regulated air and cleanliness requirements, so they need to be scoped specifically with your pharmacy and infection-control teams rather than treated as ordinary space.

Do you handle Pharmacy Remodel Containment?

Yes — anywhere from the Treasure Coast down to the Keys. It's built with our ICRA barriers.

What's the difference between an ICRA barrier and an ICRA panel?

Nothing — it's the same modular, gasketed wall system. Contractors and infection-control teams just tend to use both words for it.

What ICRA classes can you build to?

Class I through IV. Your infection-control risk assessment sets the class, and we build to it — negative-pressure ready and HEPA compatible at any level.

04 / Start the project

Tell us about your project.

A short conversation gets you a clear proposal — scope, timeline, and pricing.

Direct line(561) 777-4958
Office2240 W Woolbright Rd, Suite #416 · Boynton Beach, FL
Service areaTreasure Coast → The Keys · Pharmacy Remodel Containment

Talk to our team

Get a clear proposal.