Southeast Florida · Treasure Coast → The Keys

01 / Use Case · Southeast Florida

TWS Exceeds ICRA Class I–IV

Hospital Construction & Renovation Containment

Temporary walls for hospital construction and renovation, built to Class I–IV and put up around floors that stay in use.

  • Compliance
    ICRA Class I–IV
  • Construction
    Sealed & Gasketed
  • Coverage
    Treasure Coast → The Keys

Request a quote

Get a clear proposal.

(561) 777-4958
NFPA & IBC Class A Fire Rating — Exceeds ASTM E84
Trusted by the teams building
Brasfield & Gorrie
Whiting-Turner
HCA Florida
Memorial
Lifetime Fitness
Tim Hortons
United Rentals
Gilbane
LEGO
WBC
Skechers
Baptist Health
Fulcrum Construction
Brasfield & Gorrie
Whiting-Turner
HCA Florida
Memorial
Lifetime Fitness
Tim Hortons
United Rentals
Gilbane
LEGO
WBC
Skechers
Baptist Health
Fulcrum Construction
TWS modular containment wall for Hospital Construction & Renovation Containment — installed in an occupied hospital corridor

What's included

A hospital renovation is rarely one project. It's a sequence of them, moving through departments with different risk classes, different occupancy, and different hours — while the campus around them runs continuously. The containment has to be as sequenced as the construction. This work pairs our ICRA barriers and dust containment — two things we do on projects across Southeast Florida, brought together here. Anti-microbial panels, gasketed seals, and managed wall penetrations go into every barrier we build, whatever the job spec happens to call it.

100%
Dust containment
  • Class I–IV barrier construction
  • Negative-pressure ready
  • HEPA & airlock compatible
  • Managed wall penetrations
  • Flexible installation scheduling
  • Phased reconfiguration
  • Sealed, gasketed panel construction

03 / What this environment demands

Why hospital construction & renovation containment is its own problem.

  1. Every department is a different risk class

    The same project can cross a Class II corridor and a Class IV unit. The barrier spec changes with it.

  2. There is no closing time

    A hospital runs 24/7. Access windows come from the facilities team, not from a standard workday.

  3. Corridors are life-safety paths

    Egress, fire routes, and equipment access have to stay usable while the wall is up.

We work in every kind of healthcare facility — if your setting isn't listed here, it's still one we cover. These pages exist because people search by department, not because the list is a limit.

FAQ

Common Hospital Construction & Renovation Containment questions

Have questions? Call or text (561) 777-4958.

Can the barrier move as the project moves between departments?

Yes — phased reconfiguration is part of how the system is meant to be used. The panels come down and go back up in the next footprint rather than being rebuilt from scratch.

How do you work around a 24/7 department?

We schedule installation around the access windows your facilities team sets rather than assuming a standard workday.

Do you handle Hospital Construction & Renovation Containment?

Yes — anywhere from the Treasure Coast down to the Keys. It's built with our ICRA barriers and dust containment.

What's the difference between an ICRA barrier and an ICRA panel?

Nothing — it's the same modular, gasketed wall system. Contractors and infection-control teams just tend to use both words for it.

What ICRA classes can you build to?

Class I through IV. Your infection-control risk assessment sets the class, and we build to it — negative-pressure ready and HEPA compatible at any level.

04 / Start the project

Tell us about your project.

A short conversation gets you a clear proposal — scope, timeline, and pricing.

Direct line(561) 777-4958
Office2240 W Woolbright Rd, Suite #416 · Boynton Beach, FL
Service areaTreasure Coast → The Keys · Hospital Construction & Renovation Containment

Talk to our team

Get a clear proposal.