01 / Use Case · Southeast Florida
Dust Containment for Commercial Renovation
Sealed dust containment for occupied offices and commercial space — 100% dust containment across our installs.
- ComplianceICRA Class I–IV
- ConstructionSealed & Gasketed
- CoverageTreasure Coast → The Keys

























What's included
Dust doesn't stay near the work. It rides air currents down corridors and through shared HVAC, and it turns up in offices and retail floors nowhere near the project. Stopping it at the source is the only approach that holds — once it's in the return air, it's everyone's problem. This work is built with our dust containment, the same system we install across Southeast Florida. The gasketed seals and managed penetrations that go into every hospital barrier are what keep dust on the construction side of the wall.
- Sealed, gasketed panel construction
- Managed wall penetrations
- HEPA & airlock compatible
- Flexible installation scheduling
- Phased reconfiguration
02 / Industries we serve
Making construction zones blend in.
03 / What this environment demands
Why dust containment for commercial renovation is its own problem.
Shared HVAC distributes it
Return air will carry dust well past the work area unless it's stopped at the wall.
Occupants notice immediately
Dust on desks and merchandise generates complaints faster than almost anything else on a project.
Sheeting and tape leak
Plastic gaps at the edges. Sealed, gasketed panels are what actually holds a boundary.
FAQ
Common Dust Containment for Commercial Renovation questions
Have questions? Call or text (561) 777-4958.
How much dust does a sealed wall actually stop?
100% containment across our installs — the difference between a gasketed panel wall and taped sheeting is the seal at every edge and penetration.
Will it help with noise as well?
Yes — up to 50% less noise through the wall, which in an occupied office is often the complaint that arrives before the dust does.
Do you handle Dust Containment for Commercial Renovation?
Yes — anywhere from the Treasure Coast down to the Keys. It's built with our dust containment.
Does a temporary wall actually stop dust completely?
Yes — we track 100% dust containment across our installs. It's the gasketed seal at every edge and penetration that does the work, not the panel by itself.
Is dust containment a different product from your ICRA barriers?
Same wall system, different reason for using it. What satisfies a hospital's infection-control requirements is also what keeps drywall dust out of the office next door.
04 / Start the project
Tell us about your project.
A short conversation gets you a clear proposal — scope, timeline, and pricing.









